Keys for a painless TFS upgrade experience

This weekend I had to work on the upgrade of the main Team Foundation Server we have in production. Everything went fine – despite not everything according to the planned slick idea we had. The whole thing has been longer than just yesterday, though, and it comes with several takeaways.

Here’s what, of course involving our shiny Team Foundation Server 2013. Keep in mind the scenario: thousand of users all around the world, terabytes of databases. Here we go:

  1. Plan, but do not overplan.
    We had a plan but you cannot cover anything. You cannot plan every single step and do not have a B, C, D plan. I am not talking about not having a plan, but I suggest of being confident and flexible.
    Start planning with enough time, so the right guys are involved, and keep in mind the basics of TFS and its known issues, the history of the server (in our case it was essential) and use the TFS Upgrade Guide to have a guideline to follow.
  2. Test the core, test the basic.
    This TFS survived through upgrades from 2005 on, we discovered what we thought impossible. Your team’s skills will let you fix the problems you might find.
    So test the core, verifying that all the essential pillars are working. If you find out issues, try to fix them or plan a deferral (maybe with the CSS?) if they are not critical.
    Do not start trying the latest, better tech combo. As a sample, do not start upgrading the test server to 2013 and upgrade the build servers as well. Test the existing servers (or clones of them) against the 2013 server, and only when you are sure of the result test the upgrade of them.
    File as much documentation as you can but – again – you cannot cover the 100% of cases.
  3. Problems are problems if they come out just in production. Otherwise they are issues to fix.
    You might find something to fix at a later time, which does not impact all the users but maybe a small percentage. You can work it out later.
    Instead, for instance, we hit a very nasty problem during our live production update. We had no plan for it, as it did not happen in the test. What did we do? We tried several solution (one worked, luckily Smile) while someone else worked on a mitigation plan to use in case no solution was fine.
    We did not have to use it, but if you are running a service, you have to make tradeoffs and stop the whole service for just a part of it is unacceptable.

Remember that Team Foundation Server is modular, so you can exclude a part of it in case of problems, and that usually the upgrade compatibility for who comes from the last version (2012 in our case) is almost effortless.

Tuesday, 10 December 2013

A pragmatic approach to a better manual testing

I recently had to deal with a small Functional Testing Team (two people in total) which was used to have a non-structured approach to manual testing, with several Word and Excel files used to track down the required information, absolutely no automation in place and a very personal way of dealing with issues reproduction and environments.

I thought that giving them all the Visual Studio ALM features was surely going to be overkill. Quite a greenfield situation, but combined with the requirement of retaining their habits and their knowhow as much as possible.

The first step is converting the sparse information they have as test cases into Test Cases in Team Foundation Server. It seems obvious, but it is not. You have to set up a descriptive standard, detailing steps and expected results, so that everything is coherent with the actual target but they feel comfortable with the new tool (MTM) and process.

It is also extremely important to standardize a bit the environments they work with. If they use their own local machines, set up a standard about not just toolings, but even how to reach them. If you do this, a newbie tester can be thrown in the mix and be able to start working in a near-zero time. Once they are aware that they can replicate their recordings and they can get even the videos, they will go nuts. But it is not enough…

The next logical step is either converting their action recordings into Coded UI tests or using Lab Management. There are valid reasons behind both:

Coded UI Tests

Lab Management

Validation Standardized environments
Extended behaviours Complex configurations
Integration with Visual Studio Commodity for the members

You could take both of course, but it depends on the resources you have. I went for the Lab Management route – as they are pure functional testers, so with very little code confidence - and they are happier and more productive than ever.

Wednesday, 4 December 2013

New TFS Upgrade Guide out!

The ALM Rangers just released the v3 of the TFS Upgrade Guide. Apart from the official announcement, etc., I wanted to give you a valid reason to download and use it if you are still sceptic.

Scenarios. This guide covers a handful lot of real world scenarios, like the upgrade from 2008 or different configurations. So it is not just a basic walkthrough, but it provides you a robust sample from people who already experienced the aforementioned scenarios.

Give it a try, you won’t regret it ;)